kjunstudio
Personal Wide Inserts - Project Planner
Personal Wide Inserts - Project Planner
Regular price
$2.00 USD
Regular price
Sale price
$2.00 USD
Unit price
per
Shipping calculated at checkout.
Couldn't load pickup availability
This Project Planner Inserts are made to help you plan, organise, and track your project. The Inserts are designed in 2 styles. Choose the one that matches your preference.
1. For print on A4 and US Letter size (2 on a page - with trim marks)
2. For print on Pre Cut Paper (1 on a page)
Both files does not include hole punching shape.
*** PRINT INSTRUCTIONS ***
• It is recommended to print the files with Acrobat PDF program. It can be downloaded for FREE from http://get.adobe.com/reader/
• Always use the "actual size" setting or 100%
• The pages are formatted to print double-sided.
• Always test your printer's double sided printing mechanism before printing all pages.
• For Manual Double Sided printing: Print all odd pages first, then flip the pages and print even pages behind the odd pages
• For Duplex printing: Print all pages at once
*** Important ***
• This is a DIGITAL product and will be sent to you electronically. NO physical product will be mailed to you.
• Given the digital nature of our products we are NOT ABLE TO OFFER REFUNDS.
• All designs are provided for PERSONAL USE only and cannot be resold, recreated, redistributed, reproduced, or used commercially in any way.
View full details
It is designed in portrait orientation in PERSONAL WIDE SIZE (4.75" x 6.75") and fits planners such as Foxy Fix personal wide rings.
*** You will receive 2 PDF files ***1. For print on A4 and US Letter size (2 on a page - with trim marks)
2. For print on Pre Cut Paper (1 on a page)
Both files does not include hole punching shape.
*** PRINT INSTRUCTIONS ***
• It is recommended to print the files with Acrobat PDF program. It can be downloaded for FREE from http://get.adobe.com/reader/
• Always use the "actual size" setting or 100%
• The pages are formatted to print double-sided.
• Always test your printer's double sided printing mechanism before printing all pages.
• For Manual Double Sided printing: Print all odd pages first, then flip the pages and print even pages behind the odd pages
• For Duplex printing: Print all pages at once
*** Important ***
• This is a DIGITAL product and will be sent to you electronically. NO physical product will be mailed to you.
• Given the digital nature of our products we are NOT ABLE TO OFFER REFUNDS.
• All designs are provided for PERSONAL USE only and cannot be resold, recreated, redistributed, reproduced, or used commercially in any way.

